Reference

    Custom home construction glossary.

    Plain-language definitions of the zoning, contract, energy code, and inspection terms that come up on every custom home build in Burnaby and Greater Vancouver, the words we find ourselves explaining most often at the kitchen table.

    Zoning and Site

    Floor Space Ratio (FSR)
    The maximum amount of floor area a building can have relative to the lot area. A Burnaby lot with a 0.6 FSR allows a home up to 60% of the lot area in total floor space. FSR is often the binding constraint on how large a custom home can be, more so than setbacks or lot coverage in many neighbourhoods.
    Lot Coverage
    The percentage of a lot that can be covered by the building footprint, including attached garages and covered porches. Distinct from FSR, a large two-storey home can have low lot coverage but high FSR, or vice versa.
    Setbacks
    Minimum distances a structure must maintain from property lines, front, rear, and both sides. Burnaby's R1 zone, for example, requires a 7.5-metre front setback and specific side and rear distances depending on the lot dimensions. Setbacks define the buildable envelope before a single square foot of design begins.
    Development Permit (DP)
    A permit required in addition to a building permit for certain project types or locations, character areas, large additions, some teardowns. A DP involves design review, sometimes neighbour notification, and occasionally council referral. It adds weeks to months to the overall approval timeline.
    Building Permit (BP)
    The construction approval issued by the municipality after reviewing drawings for compliance with the BC Building Code, local zoning bylaw, and any applicable energy requirements. The BP is what authorises shovels to move.
    Variance
    An approved deviation from standard zoning rules, a relaxation of a setback, a small FSR increase, or an exception to height limits. Variances require formal application, public notification in some cases, and approval by the city. Not guaranteed; plan around standard rules first.
    Covenant
    A legal restriction registered against the title of a property, limiting what can be built or done. Common covenants on Burnaby hillside lots restrict drainage alteration, require geotechnical engineer approval for construction, or limit vegetation removal. Always check title before committing to a design.

    Planning and Design

    Pre-Construction Services Agreement (PCSA)
    The contract governing the planning phase, design coordination, permit applications, consultant selection, and preliminary budgeting, before a construction contract is issued. A PCSA protects both the owner and the builder by documenting scope and expectations at the planning stage, before construction costs are committed.
    Schematic Design (SD)
    The earliest design phase: rough massing, floor plan layouts, and overall architectural direction. At SD, room sizes are approximate, wall locations aren't final, and no permit package exists. SD is where program decisions (how many bedrooms, where the kitchen goes, how the entry relates to the street) are made.
    Design Development (DD)
    The phase following SD where the design is coordinated with structure, mechanical, and other systems. Floor plans and elevations reach a level of detail sufficient for costing and permit submission.
    Construction Documents (CDs)
    The complete set of drawings and specifications from which a building permit is applied for and from which construction is executed. CDs include architectural, structural, mechanical, and electrical drawings, plus a specification document describing material and product standards.

    Contracts

    Stipulated Price Contract
    A fixed-price construction contract covering a fully defined scope. The builder delivers the project for the stated price, assuming the drawings and specs don't change. Any change to scope after signing generates a change order. Requires complete CDs to price accurately, a stipulated price on incomplete documents is a guess.
    Cost-Plus Contract
    A contract where the owner pays actual construction costs plus a management fee. More transparent but shifts cost risk to the owner. Better suited to projects where scope is genuinely uncertain at contract time.
    Change Order
    A formal documented change to the construction contract, scope, specification, or both, with an agreed cost and schedule impact. Change orders are normal and expected on any custom home; the discipline is documenting them clearly and promptly.
    Allowance
    A budgeted dollar amount within a contract for items not yet fully specified, tile, fixtures, appliances. Allowances are placeholders; if selections exceed the allowance, the difference comes back as a change order. Low allowances are the most common source of surprises on custom home budgets.

    Construction

    Critical Path
    The sequence of construction activities where a delay to any one item delays the overall project completion date. On a typical custom home, the critical path runs through permits, site work, foundation, framing, rough mechanical, insulation, drywall, finish trades, and final inspections. Anything off the critical path can absorb some schedule slippage without moving the completion date.
    Substantial Completion
    The point at which the building is sufficiently complete for its intended use, even if minor deficiencies remain. In BC, substantial completion triggers the beginning of deficiency correction periods and affects lien holdback rules under the BC Builders Lien Act.
    Deficiency List (Punch List)
    The list of outstanding items, minor incomplete work, adjustments, cosmetic corrections, identified at substantial completion and resolved before final completion. A good builder maintains a running list throughout the build and closes it out systematically; a long, disorganised punch list at the end is a sign of poor site management.

    Energy and Building Science

    BC Energy Step Code
    A provincial framework requiring new buildings to progressively improve energy performance over time. Steps range from Step 1 (baseline) to Step 5 (highest residential standard), layered with a parallel Zero Carbon Step Code setting emissions targets. Burnaby's current minimum for new Part 9 single-family homes is Step 3 of the Energy Step Code plus EL-4, the strongest Zero Carbon tier, effective January 1, 2025. Confirm the requirement for your permit date with the City of Burnaby building department, as the minimum continues rising toward Step 5 by 2032.
    ACH₅₀ (Air Changes Per Hour at 50 Pascals)
    The airtightness metric measured by a blower-door test. Lower is better: a leakier house has more air changes per hour; a tighter house has fewer. Step 3, Burnaby's current minimum, requires 2.5 ACH₅₀ or better for a detached single-family home. Step 5 tightens that to 1.0, and Passive House targets 0.6. The measurement is done at midpoint (before drywall closes walls) and at final completion.
    Blower-Door Test
    A diagnostic test for building airtightness. A large fan is installed in an exterior door frame, pressurised to 50 pascals, and the resulting airflow through the building envelope is measured. The energy advisor requires a passing blower-door test to verify Step Code compliance at every step. We also run a midpoint test at rough-in to catch leaks before they're buried in insulation.
    HRV (Heat Recovery Ventilator)
    A mechanical ventilation unit that continuously exchanges stale indoor air for fresh outdoor air, recovering most of the heat from the outgoing stream. Once an envelope is sealed to Step 3 or tighter, balanced mechanical ventilation stops being optional, the house can no longer ventilate itself through incidental leakage. Properly balanced and ducted, an HRV maintains indoor air quality without the energy penalty of simple exhaust fans.
    Thermal Bridge
    A point in the building envelope where a highly conductive material interrupts the insulation layer, creating a heat-loss pathway. Concrete balcony slabs, steel lintels, and the edges of a slab-on-grade floor are common thermal bridges. Continuous exterior insulation, outboard of the sheathing, is the standard approach to eliminating them.
    EnerGuide Rating
    A rating assigned by a registered energy advisor after HERS or EnerGuide modelling. Required for Step Code compliance in BC at every step. The as-built EnerGuide report documents the home's modelled energy performance and becomes part of the homeowner's warranty package.

    Warranty and Homeowner Protection

    2-5-10 BC Home Warranty
    Mandatory coverage under the BC Homeowner Protection Act for all new homes built by licensed residential builders: 2 years on materials and labour defects, 5 years on the building envelope, including water penetration, and 10 years on structural defects in load-bearing elements. Every licensed BC builder must provide this coverage; verify the warranty provider at contract signing.
    BC Housing Residential Builder Licence
    The licence required to build new homes in BC. Issued by BC Housing and searchable on its public registry. Building without a licence voids the ability to provide mandatory warranty coverage. Verify any builder's licence before signing anything.
    Lien Holdback
    Under the BC Builders Lien Act, owners are required to hold back 10% of each progress payment until a statutory period after substantial completion. This protects subcontractors and suppliers who have lien rights against the property. A properly structured construction contract accounts for holdback, if it doesn't, ask why.

    Inspection Milestones

    Rough-In Inspection
    City inspection of framing, plumbing rough-in, and electrical rough-in before insulation and drywall close the walls. The key checkpoint for catching structural or mechanical issues while they're still accessible and correctable without major rework.
    Insulation Inspection
    Municipal inspection confirming insulation placement and vapour barrier installation before drywall proceeds. The energy advisor also checks the airtightness membrane and penetration sealing at this stage on every Step Code project.
    Final Inspection / Occupancy Permit
    The final municipal sign-off confirming the building is complete and compliant with all applicable code requirements. The occupancy permit is required before the home can be legally occupied. The 2-5-10 warranty paperwork is issued at or near this milestone.